Skip to main content

Search OfficeIMO

Enter a topic, API type, or PowerShell command.

Documentation Search all OfficeIMO/
Class

ProjectResource

OfficeIMO.Project

Namespace
OfficeIMO.Project
Assembly
OfficeIMO.Project
Source revision
ba882f6b0d07 with working tree changes
Modifiers
sealed

A work, material, or cost resource; imported rates and actuals are retained without calculation.

Inheritance

Usage

Explore 15 API references to this type

This type appears in these public API surfaces even when no hand-authored example is attached directly to the page.

Accepted by parameters 2

Methods

public ProjectResource SetAlias(string alias) #

Registers a document-local resource alias for deferred assignments.

Parameters

alias string required
public ProjectResource SetCalendar(ProjectCalendar value) #

Assigns an explicit resource calendar.

Parameters

value OfficeIMO.Project.ProjectCalendar required
public ProjectResource SetMaterial(string label) #

Sets a material resource kind and its label.

Parameters

label string required
public ProjectResource SetMaxUnits(ProjectUnits value) #

Sets maximum allocation.

Parameters

value OfficeIMO.Project.ProjectUnits required
public ProjectResource SetName(string value) #

Sets the resource name.

Parameters

value string required
public ProjectResource SetStandardRate(decimal value) #

Sets the standard monetary rate.

Parameters

value decimal required

Properties

public ProjectCollection<ProjectResourceAvailability> AvailabilityPeriods { get; } #

Dated capacity periods. Outside explicitly listed periods capacity is zero; an empty collection uses MaxUnits.

public ProjectCollection<ProjectResourceRate> Rates { get; } #

Dated cost rates grouped by table A through E. Work rates are expressed per hour; material rates are per material unit.

public ProjectCostAccrual? AccrueAt { get; set; } #

When work or material costs accrue. Per-use costs are charged once when the assignment starts.

public bool? CanLevel { get; set; } #

Whether explicit resource leveling may move this resource's assignments.

public ProjectCollection<ProjectTimephasedValue> TimephasedData { get; } #

Compact source timephased intervals.

public ProjectCollection<ProjectBaseline> Baselines { get; } #

Stored baseline snapshots.

public ProjectCollection<ProjectCustomFieldValue> CustomFields { get; } #

Custom values and lookup references.

public ProjectCollection<ProjectCustomFieldValue> OutlineCodes { get; } #

Outline-code selections referencing hierarchical lookup values.

public ProjectCalendar? Calendar { get; set; } #

Explicit calendar reference; null means no explicit calendar on this object.

public int? DisplayId { get; set; } #

Display row identifier, separate from the stable UID.

public ProjectResourceType? Type { get; set; } #

Stored type; null represents an absent source value.

public string? Initials { get; set; } #

Stored initials; null represents an absent source value.

public string? Group { get; set; } #

Stored group; null represents an absent source value.

public string? EmailAddress { get; set; } #

Stored email address; null represents an absent source value.

public string? MaterialLabel { get; set; } #

Stored material label; null represents an absent source value.

public ProjectUnits? MaxUnits { get; set; } #

Stored max units; null represents an absent source value.

public decimal? StandardRate { get; set; } #

Stored standard rate; null represents an absent source value.

public decimal? OvertimeRate { get; set; } #

Stored overtime rate; null represents an absent source value.

public decimal? CostPerUse { get; set; } #

Currency charge per assigned work-resource unit, or once per material assignment regardless of quantity; null represents an absent source value.

public decimal? Cost { get; set; } #

Stored cost; null represents an absent source value.

public decimal? ActualCost { get; set; } #

Stored actual cost; null represents an absent source value.

public decimal? RemainingCost { get; set; } #

Stored remaining cost; explicit assignment calculation refreshes this resource total.

public ProjectWork? Work { get; set; } #

Stored work; null represents an absent source value.

public ProjectWork? ActualWork { get; set; } #

Stored actual work; null represents an absent source value.

public ProjectWork? RemainingWork { get; set; } #

Stored remaining work; null represents an absent source value.

public string? Notes { get; set; } #

Stored notes; null represents an absent source value.

public bool? IsNull { get; set; } #

Stored is null; null represents an absent source value.